REF NO PROV. LOCATION BOREHOLE ID LATITUDE LONGITUDE UNIT NAME DEPTH(m) SPL TYPE TOC S1 S2 S3 PI HI OI TMAX
4840 NWT-YU TRAINOR LAKE B-24 300B246010119450 60.05 119.83 Pine Point 1725.17 CUT 0.15 0.06 0.06 0.12 0.50 40 80 0
4841 NWT-YU TRAINOR LAKE B-24 300B246010119450 60.05 119.83 Pine Point 1731.26 CUT 0.60 0.07 0.11 0.09 0.39 18 15 0
4842 NWT-YU TRAINOR LAKE B-24 300B246010119450 60.05 119.83 Pine Point 1737.36 CUT 0.27 0.05 0.17 0.29 0.23 62 107 0
4843 NWT-YU TRAINOR LAKE B-24 300B246010119450 60.05 119.83 Pine Point 1743.46 CUT 0.41 0.13 0.19 0.24 0.41 46 58 0
4844 NWT-YU TRAINOR LAKE B-24 300B246010119450 60.05 119.83 Pine Point 1749.55 CUT 0.66 0.15 0.12 0.11 0.56 18 16 0
4845 NWT-YU TRAINOR LAKE B-24 300B246010119450 60.05 119.83 Pine Point 1755.65 CUT 0.37 0.09 0.06 0.07 0.60 16 18 0
4846 NWT-YU TRAINOR LAKE B-24 300B246010119450 60.05 119.83 Pine Point 1761.74 CUT 0.66 2.50 0.76 0.22 0.77 115 33 0
4847 NWT-YU TRAINOR LAKE B-24 300B246010119450 60.05 119.83 Pine Point 1767.84 CUT 1.22 7.74 1.72 0.52 0.82 140 42 0
4848 NWT-YU TRAINOR LAKE B-24 300B246010119450 60.05 119.83 Pine Point 1773.94 CUT 0.28 0.17 0.09 0.25 0.65 32 89 0
4849 NWT-YU TRAINOR LAKE B-24 300B246010119450 60.05 119.83 Pine Point 1780.03 CUT 0.17 0.12 0.05 0.09 0.71 29 52 0
4850 NWT-YU TRAINOR LAKE B-24 300B246010119450 60.05 119.83 Pine Point 1786.13 CUT 0.22 0.37 0.15 0.11 0.71 68 50 0
4851 NWT-YU TRAINOR LAKE B-24 300B246010119450 60.05 119.83 Pine Point 1792.22 CUT 0.15 0.25 0.14 0.07 0.64 93 46 0
3849 NWT-YU Pine Point 5389   60.85 114.41 Pine Point CORE 2.76 2.53 17.49 0.56 0.13 633 20 431
3858 NWT-YU Pine Point 6032   60.85 114.41 Pine Point CORE 4.29 2.09 28.17 1.82 0.07 657 42 431
3847 NWT-YU Pine Point 5389   60.85 114.41 Pine Point 25.60 CORE 0.42 0.16 1.00 0.36 0.14 238 85 432
3850 NWT-YU Pine Point 5389   60.85 114.41 Pine Point 32.31 CORE 8.79 5.50 55.46 1.67 0.09 630 18 429
3851 NWT-YU Pine Point 5389   60.85 114.41 Pine Point 32.31 CORE 9.44 6.10 59.31 0.54 0.09 628 6 427
3844 NWT-YU Pine Point 5305   60.85 114.41 Pine Point 32.92 CORE 7.58 4.88 46.11 0.87 0.10 609 11 426
3845 NWT-YU Pine Point 5305   60.85 114.41 Pine Point 32.92 CORE 7.81 5.92 48.66 0.76 0.11 623 10 427
3846 NWT-YU Pine Point 5305   60.85 114.41 Pine Point 40.54 CORE 9.05 6.74 53.74 0.64 0.11 594 7 426
3852 NWT-YU Pine Point 5389   60.85 114.41 Pine Point 40.54 CORE 3.45 2.60 21.57 1.23 0.11 625 35 432
3848 NWT-YU Pine Point 5389   60.85 114.41 Pine Point 42.06 CORE 2.51 7.19 14.72 1.73 0.33 586 68 429
3864 NWT-YU Pine Point 6040   60.85 114.41 Pine Point 43.28 CORE 3.77 4.54 21.59 1.24 0.17 572 32 431
3859 NWT-YU Pine Point 6040   60.85 114.41 Pine Point 45.11 CORE 0.90 2.50 5.32 1.16 0.32 591 128 427
3853 NWT-YU Pine Point 5389   60.85 114.41 Pine Point 47.55 CORE 4.70 3.78 27.21 1.15 0.11 531 33 434
3854 NWT-YU Pine Point 5389   60.85 114.41 Pine Point 47.55 CORE 13.31 10.11 75.48 1.02 0.12 567 8 427
3865 NWT-YU Pine Point 6040   60.85 114.41 Pine Point 50.90 CORE 4.61 3.92 27.88 1.24 0.11 574 39 431
3860 NWT-YU Pine Point 6040   60.85 114.41 Pine Point 53.04 CORE 0.81 2.17 4.71 0.64 0.33 702 326 425
3866 NWT-YU Pine Point 6040   60.85 114.41 Pine Point 61.26 CORE 7.84 5.52 49.60 1.65 0.10 618 22 431
3855 NWT-YU Pine Point 5389   60.85 114.41 Pine Point 62.18 CORE 4.79 3.19 28.10 1.11 0.10 555 38 432
3861 NWT-YU Pine Point 6040   60.85 114.41 Pine Point 62.48 CORE 0.70 1.27 4.44 0.99 0.22 684 328 430
3862 NWT-YU Pine Point 6040   60.85 114.41 Pine Point 80.77 CORE 3.23 2.71 20.16 1.65 0.11 568 53 433
3867 NWT-YU Pine Point 6040   60.85 114.41 Pine Point 86.87 CORE 10.13 6.27 66.77 1.56 0.08 637 16 426
3863 NWT-YU Pine Point 6040   60.85 114.41 Pine Point 90.53 CORE 0.50 0.30 2.56 0.66 0.08 720 785 429
3868 NWT-YU Pine Point 6040   60.85 114.41 Pine Point 97.54 CORE 5.31 2.37 32.41 1.83 0.07 580 39 430
3856 NWT-YU Pine Point 5659   60.85 114.41 Pine Point 119.79 CORE 3.46 2.43 21.54 0.33 0.10 624 9 422
3857 NWT-YU Pine Point 5661   60.85 114.41 Pine Point 120.45 CORE 7.01 1.97 50.64 0.55 0.04 722 7 432
3870 NWT-YU Pine Point JMBS-4   60.85 114.41 Pine Point 187.15 CORE 0.48 0.03 0.26 0.71 0.10 54 148 429
3874 NWT-YU Pine Point JMBS-9   60.85 114.41 Pine Point 208.18 CORE 8.61 4.44 44.17 0.88 0.09 513 10 438
3873 NWT-YU Pine Point JMBS-8   60.85 114.41 Pine Point 211.80 CORE 7.10 2.50 34.88 1.02 0.07 350 14 440
3871 NWT-YU Pine Point JMBS-4   60.85 114.41 Pine Point 216.41 CORE 0.66 0.30 0.95 0.75 0.24 144 114 434
3872 NWT-YU Pine Point JMBS-4   60.85 114.41 Pine Point 220.98 CORE 3.36 1.72 16.28 0.75 0.10 485 22 438
3875 NWT-YU Pine Point JMBS-9   60.85 114.41 Pine Point 224.60 CORE 2.07 0.68 8.95 0.78 0.08 432 38 449
3869 NWT-YU Pine Point JMBS-1   60.85 114.41 Pine Point 251.16 CORE 5.85 2.93 28.55 0.90 0.09 488 15 440
4093 NWT-YU FOETUS LAKE #1 D-06 300D066100118300 60.92 118.53 Pine Point 791.57 CORE 4.44 1.50 23.80 0.57 0.06 536 12 438